S.No
Year
Description of Project
Principal
Main contractor / Sub contractor
AGP.CO. Contract Value US$
1
2002-2003
Kuwait Naval Base – Concrete Slipway
US.Army
Alghanim Specialities
449,456/-
2
2002-2003
Kuwait Naval Base – Marine Salvage Operation
US.Army
Alghanim Specialities
309,625/-
3
2002-2003
Kuwait Naval Base–Dolphins Connections
US.Army
Arabian Gulf Pearl Co.
168,063/-
4
2002-2003

Kuwait Naval Base – Floating pontoon
80m Length x 4m width x 1.5m Height

US.Army
Arabian Gulf Pearl Co.
492,736/-
5
2002-2003
Kuwait Naval Base – Supply and Fixing Navigation Lights
US.Army
Arabian Gulf Pearl Co.
63,257/-
6
2002
Kuwait Oil Sector – Shuwaikh Fixation of 10 no. Steel Tubular Piles
K.O.C
Kuwait Bruckner Co.
26,634/-
7
2001
Failaka Island - Fixation of 11 no. Steel Tubular Piles
Private Marine
Gulf Dredging Co.
29,964/-
8
2001
Fahahil Water Front – Fixation of 8 no. Steel Tubular Piles
Al Tamden Real Estate Co.
Gulf Dredging Co.
26,634/-
9
2000
Salvage operation Sunk Barge – Doha area
MOD
AGP.CO.
118,750/-
10
2000
Supply and install of pipe piles, pontoon at Kuwait Naval Base (Small and Medium Harbour )
MOD
Al Ghanim Spec./ AGP.CO.
1,000,000/-
11
2000
Supply and install 13 pipe piles, navigational lights for both Yacht Club and Fishermen club at Kuwait Sea Front.
National Real Estate
AGP.CO.
87,500/-
12
1999
Supply and install of pipe piles for floating pontoon Bedah Club
Coast Guard
Al Ghanim Spec. / AGP.CO.
500,000/-
13
1999
Supply and install of pipe piles for floating pontoons Officers club – Bined Al Gar
MOD
Al Ghanim Spec. / AGP.CO.
320,000/-
14
1997
Capitol Dredging Work Meselah – 37,000 cm
Sheikh Khalid Al Sabah
AGP.CO.
550,375/-
15
1997
Reconditioning of Floating Steel Pontoons, Platform and pipe pile supply and install-Shuwaikh
Trans Universal Seas
AGP.CO.
180,900/-
16
1996
Maintenance Dredging work at Minal Al Zour 18,000 m 3
M.E.W
MHI / AGP.CO.
252,000/-
17
1996
Transportation of (Gravel/Sand) from Subia to Warba Island
MOD
Al Ghanim Spec / AGP.CO.
210,000/-
18
1995
Supply and install of pipe piles for all cages at Doha
Bubiyan Fisheries
AGP.CO.
43,750/-
19
1995
Construction of Two jetties at “GARAW &AMAL Maradem” Island
MOD
TOWA / ISCO / AGP.CO
380,000/-


S.No Year Description of Project Principal Main contractor / Sub contractor AGPC Contract Value US$
1 2005 Removing and cleaning 20",16", 20000 feet length under water crud oil pipe line K.N.P.C Arabian Gulf Pearl CO. 600,000/-
2 2004-2005 Lifting11No.crud oil loading arms at ELAHMADE Port K.N.P.C. ELGHANIM Equipment holding co./AGPC 620,000/-
3 2004 Driving 42 No. 28" diameter steel tubular piles Cost Guard Boodai Const. / Arab Contractor / AGPC 115,000/-
4 2004 Ship wrecks removal from ELZUPER Port at Iraq K.P.R ELRATBAA Co./AGPC 1000,000/-
5 2004 Reparation of damaged fisher bridge at Kuwait city water front National real stat Co. Arabian Gulf Pearl CO. 60,000/-
6 2004 Ship wrecks removal from shuwaik free zoon area beach Ministry of communications G.D.C./AGPC 630,000/-
7 2003-2004 ALKIHRAN Pearl city-construction of 21groyns&concrete slipway LA AAL ELKUWAIT Real stat co. Arabian Gulf Pearl CO. 730,000/-
8 2002-2003 Kuwait Naval Base – Concrete flooring & asphelt roads complete USA . Army Alghanim Specialities/AGPC 866,667/-
9 2002-2003 Kuwait Naval Base – Construction of structure steel building( 35-k) USA . Army Alghanim Specialities/AGPC 300,000/-
10 2002-2003 Kuwait Naval Base – Construction of structure steel building( 10-k) USA . Army Alghanim Specialities/AGPC 350,000/-
11 2002-2003 Kuwait Naval Base – Concrete Slipway USA . Army Alghanim Specialities/AGPC 449,456/-
12 2002-2003 Kuwait Naval Base – Marine Salvage Operation USA . Army Alghanim Specialities/AGPC 309,625/-
13 2002-2003 Kuwait Naval Base–Dolphins Connections USA . Army Arabian Gulf Pearl Co. 168,063/-
14 2002-2003

Kuwait Naval Base – Floating pontoon
80m Length x 4m width x 1.5m Height

US . Army Arabian Gulf Pearl Co. 492,736/-
15 2002-2003 Kuwait Naval Base – Supply and Fixing Navigation Lights US . Army Arabian Gulf Pearl Co. 63,257/-
16 2002 Kuwait Oil Sector – Shuwaikh Fixation of 10 no. Steel Tubular Piles K.O.C Kuwait Bruckner Co./AGPC 26,634/-
17 2001 Failaka Island - Fixation of 11 no. Steel Tubular Piles Private Marine Gulf Dredging Co./AGPC 29,964/-
18 2001 Fahahil Water Front – Fixation of 8 no. Steel Tubular Piles Al Tamden Real Estate Co. Gulf Dredging Co./AGPC 26,634/-
19 2000/2001 Al Beheth Control and monitoring center (civil/ electrical/ mechanical work) MOD AGPC 1,000,000/-
20 2000 Design 3 target VSL to Naval Forces for the “Sea SKUA” French missile MOD AGPC 105,000/-
21 2000 Salvage operation Sunk Barge – Doha area MOD AGPC 118,750/-
22 2000 Design and construction of Monument as a gift from GPC to Kuwait Naval forces MOHD. AL AHMED BASE Monument – designed by Artist Samie Mohammed. MOD AGPC 138,000/-
23 2000 Supply and install of pipe piles, pontoon at Kuwait Naval Base (Small and Medium Harbour ) MOD Al Ghanim Spec./ AGPC 1,000,000/-
24 2000 Supply and install 13 pipe piles, navigational lights for both Yacht Club and Fishermen club at Kuwait Sea Front. National Real Estate AGPC 87,500/-
25 2000 Towage of 25 M Dead ship from Kuwait to Arabian Sea / Oman about 1380 mile (Target for the Exhaust MM40 Missile exercise – G.C.C Countries Countries. Countries. MOD AGPC 87,500/-
26 1999/2000 Charting Flat Barge and Tug boat Kuwait Arab Contractors Coast Guard Boodai Const. / Arab Contractor / AGPC 178,750/-
27 1999 Supply and install of pipe piles for floating pontoon Bedah Club Coast Guard Al Ghanim Spec. / AGPC 500,000/-
28 1999 Supply and install of pipe piles for floating pontoons Officers club – Bined Al Gar MOD Al Ghanim Spec. / AGPC 320,000/-
29 1999 Chartering of 2 Flat Boat one tug boat and one work boat to Rasas Contracting Co. – 144 days Salem Al Sabah Palace Rasas / AGPC 257,040/-
30 1998 Maintenance Dredging for 12,500 Cubic meter – Marina Foud Al Ghanim Palace “Messelah” AGPC 218,750/-
31 1998 Maintenance of 37 fish farm cages at Doha (Serviceto Net Pontoon Floaters – Anchors, ets.) Bubiyan Fisheries AGPC 93,800/-
32 1998 Sheet pile insulation for new building Al Ghanim Group Co. Shuwaikh Al Ghanim Equipment Co. Al Ghanim Spec. / AGPC 296,670/-
33 1998 Chartering of Crane barge and Tug boat 60 days Ministry of Communication Al Shabah Int'l Co. / AGPC 105,000/-
34 1997 Capitol Dredging Work Meselah – 37,000 cm Sheikh Khalid Al Sabah AGPC 550,375/-
35 1997 Transportation of building materials 5000 ton from Shabia to Warba Island MOD Al Kulaib Int'l Co. / AGPC 55,000/-
36 1997 Chartering of one crane Barge and one Tug Boat at Warba Island 90 days MOD Ras Al Bahar Co. / AGPC 192,500/-
37 1997 Supply and Installation of Sheet Piles – 145 Linear meter (Sheet length=13m, Penetration=5m) Shkh. Salem Al Sabah - Messilah Pal. ARSSAN General Trading & Cont. / AGPC 233,450/-
38 1997 Maintenance of 37 fish Farm cages at Doha Bubiyan Fisheries AGPC 99,800/-
39 1997 Reconditioning of Floating Steel Pontoons, Platform and pipe pile supply and install-Shuwaikh Trans Universal Seas AGPC 180,900/-
40 1996 Maintenance Dredging work at Minal Al Zour 18,000 m 3 M.E.W MHI / AGPC 252,000/-
41 1996 Replatin of Flat Barge 30mx12.5mx2.5m KNOSE AGPC 61,350/-
42 1996 Transportation of Heavy Equipment from Mina Abdulla Jetty to Mina Abdulla Sea Island KNPC CCC / AGPC 192,500/-
43 1996 Maintenance of 37 Fish Farm cages at Doha Bubiyan Fisheries AGPC 105,900/-
44 1996 Transportation of (Gravel/Sand) from Subia to Warba Island MOD Al Ghanim Spec / AGPC 210,000/-
45 1995 Chartering of Two Crane Barges, Two tug boats and two work boat North part of Kuwait – 95 days MOD Al Ghanim Spec / AGPC 693,000/-
46 1995 Supply and install of pipe piles for all cages at Doha Bubiyan Fisheries AGPC 43,750/-
47 1995 Construction of Two jetties at “GARAW &AMAL Maradem” Island MOD TOWA / ISCO / AGPC 380,000/-
48 1995 Maintenance of 37 Fish Farm cages at Doha Bubiyan Fisheries AGPC 108,000/-

 
Home | About us | Our Objectives | Management Responsibility | Our Vessels | Our Projects | Contact Us