S.No |
Year |
Description of Project |
Principal |
Main contractor / Sub contractor |
AGP.CO. Contract Value US$ |
1 |
2002-2003 |
Kuwait Naval Base – Concrete Slipway |
US.Army |
Alghanim Specialities |
449,456/- |
2 |
2002-2003 |
Kuwait Naval Base – Marine Salvage Operation |
US.Army |
Alghanim Specialities |
309,625/- |
3 |
2002-2003 |
Kuwait Naval Base–Dolphins Connections |
US.Army |
Arabian Gulf Pearl Co. |
168,063/- |
4 |
2002-2003 |
Kuwait Naval Base – Floating pontoon
80m Length x 4m width x 1.5m Height
|
US.Army |
Arabian Gulf Pearl Co. |
492,736/- |
5 |
2002-2003 |
Kuwait Naval Base – Supply and Fixing Navigation Lights |
US.Army |
Arabian Gulf Pearl Co. |
63,257/- |
6 |
2002 |
Kuwait Oil Sector – Shuwaikh Fixation of 10 no. Steel Tubular Piles |
K.O.C |
Kuwait Bruckner Co. |
26,634/- |
7 |
2001 |
Failaka Island - Fixation of 11 no. Steel Tubular Piles |
Private Marine |
Gulf Dredging Co. |
29,964/- |
8 |
2001 |
Fahahil Water Front – Fixation of 8 no. Steel Tubular Piles |
Al Tamden Real Estate Co. |
Gulf Dredging Co. |
26,634/- |
9 |
2000 |
Salvage operation Sunk Barge – Doha area |
MOD |
AGP.CO. |
118,750/- |
10 |
2000 |
Supply and install of pipe piles, pontoon at Kuwait Naval Base (Small and Medium Harbour ) |
MOD |
Al Ghanim Spec./ AGP.CO. |
1,000,000/- |
11 |
2000 |
Supply and install 13 pipe piles, navigational lights for both Yacht Club and Fishermen club at Kuwait Sea Front. |
National Real Estate |
AGP.CO. |
87,500/- |
12 |
1999 |
Supply and install of pipe piles for floating pontoon Bedah Club |
Coast Guard |
Al Ghanim Spec. / AGP.CO. |
500,000/- |
13 |
1999 |
Supply and install of pipe piles for floating pontoons Officers club – Bined Al Gar |
MOD |
Al Ghanim Spec. / AGP.CO. |
320,000/- |
14 |
1997 |
Capitol Dredging Work Meselah – 37,000 cm |
Sheikh Khalid Al Sabah |
AGP.CO. |
550,375/-
|
15 |
1997 |
Reconditioning of Floating Steel Pontoons, Platform and pipe pile supply and install-Shuwaikh |
Trans Universal Seas |
AGP.CO. |
180,900/- |
16 |
1996 |
Maintenance Dredging work at Minal Al Zour 18,000 m 3 |
M.E.W |
MHI / AGP.CO. |
252,000/- |
17 |
1996 |
Transportation of (Gravel/Sand) from Subia to Warba Island |
MOD |
Al Ghanim Spec / AGP.CO. |
210,000/- |
18 |
1995 |
Supply and install of pipe piles for all cages at Doha |
Bubiyan Fisheries |
AGP.CO. |
43,750/- |
19 |
1995 |
Construction of Two jetties at “GARAW &AMAL Maradem” Island |
MOD |
TOWA / ISCO / AGP.CO |
380,000/- |
|
| S.No |
Year |
Description of Project |
Principal |
Main contractor / Sub contractor |
AGPC Contract Value US$ |
| 1 |
2005 |
Removing and cleaning 20",16", 20000 feet length under water crud oil pipe line |
K.N.P.C |
Arabian Gulf Pearl CO. |
600,000/- |
| 2 |
2004-2005 |
Lifting11No.crud oil loading arms at ELAHMADE Port |
K.N.P.C. |
ELGHANIM Equipment holding co./AGPC |
620,000/- |
| 3 |
2004 |
Driving 42 No. 28" diameter steel tubular piles |
Cost Guard |
Boodai Const. / Arab Contractor / AGPC |
115,000/- |
| 4 |
2004 |
Ship wrecks removal from ELZUPER Port at Iraq |
K.P.R |
ELRATBAA Co./AGPC |
1000,000/- |
| 5 |
2004 |
Reparation of damaged fisher bridge at Kuwait city water front |
National real stat Co. |
Arabian Gulf Pearl CO. |
60,000/- |
| 6 |
2004 |
Ship wrecks removal from shuwaik free zoon area beach |
Ministry of communications |
G.D.C./AGPC |
630,000/- |
| 7 |
2003-2004 |
ALKIHRAN Pearl city-construction of 21groyns&concrete slipway |
LA AAL ELKUWAIT Real stat co. |
Arabian Gulf Pearl CO. |
730,000/- |
| 8 |
2002-2003 |
Kuwait Naval Base – Concrete flooring & asphelt roads complete |
USA . Army |
Alghanim Specialities/AGPC |
866,667/- |
| 9 |
2002-2003 |
Kuwait Naval Base – Construction of structure steel building( 35-k) |
USA . Army |
Alghanim Specialities/AGPC |
300,000/- |
| 10 |
2002-2003 |
Kuwait Naval Base – Construction of structure steel building( 10-k) |
USA . Army |
Alghanim Specialities/AGPC |
350,000/- |
| 11 |
2002-2003 |
Kuwait Naval Base – Concrete Slipway |
USA . Army |
Alghanim Specialities/AGPC |
449,456/- |
| 12 |
2002-2003 |
Kuwait Naval Base – Marine Salvage Operation |
USA . Army |
Alghanim Specialities/AGPC |
309,625/- |
| 13 |
2002-2003 |
Kuwait Naval Base–Dolphins Connections |
USA . Army |
Arabian Gulf Pearl Co. |
168,063/- |
| 14 |
2002-2003 |
Kuwait Naval Base – Floating pontoon
80m Length x 4m width x 1.5m Height |
US . Army |
Arabian Gulf Pearl Co. |
492,736/- |
| 15 |
2002-2003 |
Kuwait Naval Base – Supply and Fixing Navigation Lights |
US . Army |
Arabian Gulf Pearl Co. |
63,257/- |
| 16 |
2002 |
Kuwait Oil Sector – Shuwaikh Fixation of 10 no. Steel Tubular Piles |
K.O.C |
Kuwait Bruckner Co./AGPC |
26,634/- |
| 17 |
2001 |
Failaka Island - Fixation of 11 no. Steel Tubular Piles |
Private Marine |
Gulf Dredging Co./AGPC |
29,964/- |
| 18 |
2001 |
Fahahil Water Front – Fixation of 8 no. Steel Tubular Piles |
Al Tamden Real Estate Co. |
Gulf Dredging Co./AGPC |
26,634/- |
| 19 |
2000/2001 |
Al Beheth Control and monitoring center (civil/ electrical/ mechanical work) |
MOD |
AGPC |
1,000,000/- |
| 20 |
2000 |
Design 3 target VSL to Naval Forces for the “Sea SKUA” French missile |
MOD |
AGPC |
105,000/- |
| 21 |
2000 |
Salvage operation Sunk Barge – Doha area |
MOD |
AGPC |
118,750/- |
| 22 |
2000 |
Design and construction of Monument as a gift from GPC to Kuwait Naval forces MOHD. AL AHMED BASE Monument – designed by Artist Samie Mohammed. |
MOD |
AGPC |
138,000/- |
| 23 |
2000 |
Supply and install of pipe piles, pontoon at Kuwait Naval Base (Small and Medium Harbour ) |
MOD |
Al Ghanim Spec./ AGPC |
1,000,000/- |
| 24 |
2000 |
Supply and install 13 pipe piles, navigational lights for both Yacht Club and Fishermen club at Kuwait Sea Front. |
National Real Estate |
AGPC |
87,500/- |
| 25 |
2000 |
Towage of 25 M Dead ship from Kuwait to Arabian Sea / Oman about 1380 mile (Target for the Exhaust MM40 Missile exercise – G.C.C Countries Countries. Countries. |
MOD |
AGPC |
87,500/- |
| 26 |
1999/2000 |
Charting Flat Barge and Tug boat Kuwait Arab Contractors |
Coast Guard |
Boodai Const. / Arab Contractor / AGPC |
178,750/- |
| 27 |
1999 |
Supply and install of pipe piles for floating pontoon Bedah Club |
Coast Guard |
Al Ghanim Spec. / AGPC |
500,000/- |
| 28 |
1999 |
Supply and install of pipe piles for floating pontoons Officers club – Bined Al Gar |
MOD |
Al Ghanim Spec. / AGPC |
320,000/- |
| 29 |
1999 |
Chartering of 2 Flat Boat one tug boat and one work boat to Rasas Contracting Co. – 144 days |
Salem Al Sabah Palace |
Rasas / AGPC |
257,040/- |
| 30 |
1998 |
Maintenance Dredging for 12,500 Cubic meter – Marina |
Foud Al Ghanim Palace “Messelah” |
AGPC |
218,750/- |
| 31 |
1998 |
Maintenance of 37 fish farm cages at Doha (Serviceto Net Pontoon Floaters – Anchors, ets.) |
Bubiyan Fisheries |
AGPC |
93,800/- |
| 32 |
1998 |
Sheet pile insulation for new building Al Ghanim Group Co. Shuwaikh |
Al Ghanim Equipment Co. |
Al Ghanim Spec. / AGPC |
296,670/- |
| 33 |
1998 |
Chartering of Crane barge and Tug boat 60 days |
Ministry of Communication |
Al Shabah Int'l Co. / AGPC |
105,000/- |
| 34 |
1997 |
Capitol Dredging Work Meselah – 37,000 cm |
Sheikh Khalid Al Sabah |
AGPC |
550,375/- |
| 35 |
1997 |
Transportation of building materials 5000 ton from Shabia to Warba Island |
MOD |
Al Kulaib Int'l Co. / AGPC |
55,000/- |
| 36 |
1997 |
Chartering of one crane Barge and one Tug Boat at Warba Island 90 days |
MOD |
Ras Al Bahar Co. / AGPC |
192,500/- |
| 37 |
1997 |
Supply and Installation of Sheet Piles – 145 Linear meter (Sheet length=13m, Penetration=5m) |
Shkh. Salem Al Sabah - Messilah Pal. |
ARSSAN General Trading & Cont. / AGPC |
233,450/-
|
| 38 |
1997 |
Maintenance of 37 fish Farm cages at Doha |
Bubiyan Fisheries |
AGPC |
99,800/-
|
| 39 |
1997 |
Reconditioning of Floating Steel Pontoons, Platform and pipe pile supply and install-Shuwaikh |
Trans Universal Seas |
AGPC |
180,900/- |
| 40 |
1996 |
Maintenance Dredging work at Minal Al Zour 18,000 m 3 |
M.E.W |
MHI / AGPC |
252,000/-
|
| 41 |
1996 |
Replatin of Flat Barge 30mx12.5mx2.5m |
KNOSE |
AGPC |
61,350/-
|
| 42 |
1996 |
Transportation of Heavy Equipment from Mina Abdulla Jetty to Mina Abdulla Sea Island |
KNPC |
CCC / AGPC |
192,500/- |
| 43 |
1996 |
Maintenance of 37 Fish Farm cages at Doha |
Bubiyan Fisheries |
AGPC |
105,900/-
|
| 44 |
1996 |
Transportation of (Gravel/Sand) from Subia to Warba Island |
MOD |
Al Ghanim Spec / AGPC |
210,000/-
|
| 45 |
1995 |
Chartering of Two Crane Barges, Two tug boats and two work boat North part of Kuwait – 95 days |
MOD |
Al Ghanim Spec / AGPC |
693,000/- |
| 46 |
1995 |
Supply and install of pipe piles for all cages at Doha |
Bubiyan Fisheries |
AGPC |
43,750/- |
| 47 |
1995 |
Construction of Two jetties at “GARAW &AMAL Maradem” Island |
MOD |
TOWA / ISCO / AGPC |
380,000/- |
| 48 |
1995 |
Maintenance of 37 Fish Farm cages at Doha |
Bubiyan Fisheries |
AGPC |
108,000/- |